Produced checkable results across identified bounded internal research programs. Not externally commissioned or generally deployed.
The increase applies to bounded internal research work across separate programs. It is not a claim that the integrated Research Suite has completed customer commissioning or whole-suite qualification.
What supports the increase
- One public-reference energy-network challenge reached formal acceptance for Stages 1 and 3. Stage 3 covered a complete public-reference chronology and deterministic sensitivity campaign, with 77 of 77 invalid-mutation rejections, 6 of 6 verifier controls and 5 of 5 producer controls.
- Airbus M1 symbolic and dimensional consistency was accepted after fresh independent verification: 132 of 132 exact checks, 203 of 203 comparison and held-out checks, 57 of 57 negative mutation detections, and 6 of 6 clean controls.
- DAP AI produced one independently reviewed local L1 implementation with six targeted repair checks and nine separately frozen independent checks passing. The full corrected 144-fixture matrix was not rerun, and the wider commission retained a coordination-control breach.
- Project-designed Wildcard and Connection Mining foundations have implemented contracts, strict schemas and fail-closed validation; Connection Mining records conformance-proven orientation/read-model contracts.
Planning and readiness only
- HSBC is domain-ready and frozen for a separately authorized Factory handshake. Its readiness record passed 32 of 32 checks, but no data acquisition, modelling, experiment or provider execution followed.
- Airbus M2 has not started, official challenge-intent ambiguity remains, and no numerical solver, convergence, industrial-CFD, conformity or advantage result is accepted.
- Live Wildcard workers, research miners, literature adapters and a shared connection library remain uncommissioned; the current capability is a tested foundation, not an operating discovery service.
No external deployment, customer or challenge-owner endorsement, production-readiness guarantee, validated novelty, live-provider or QPU result, or general discovery claim follows from this status. The energy case uses public-reference data and is not customer-calibrated. The Research Suite journal remains empty because no public exhibit has been approved.